- Home
- Equities - Stocks - Shares
- Company Press Releases
- BW Energy: Drilling Operations Completed On First Hibiscus Production Well
BW Energy: Drilling operations completed on first Hibiscus production well
03 Apr 2023 07:30 CEST
Issuer
BW Energy Limited
Drilling operations completed on first Hibiscus production well
BW Energy has completed the drilling and completion operations on DHIBM-3H, the
first production well of the Hibiscus / Ruche Phase 1 development campaign in
the Dussafu licence offshore Gabon. Responsibility for the DHIBM-3H well has
been handed over to the production team which will finalise preparations for
production start-up. First oil from the well is expected in early April.
Commissioning and start-up of the new gas lift compressor will follow the first
oil activities on the FPSO.
The DHIBM-3H well has been drilled from the BW MaBoMo production facility to a
depth of 3,883 metres into Gamba sandstone reservoir in the Hibiscus field.
Drilling operations began at the start of the year with batch setting of
conductors and surface casing on three Hibiscus wells. In addition, a further
three conductors have been batch set on slots planned for Ruche / Hibiscus
fields. The drilling campaign followed the successful installation of the
production facility, risers, and pipeline. DHIBM-3H drilling results (drain
length and reservoir properties) are in line with expectations. The oil produced
at Hibiscus / Ruche will be processed on the BW Adolo FPSO together with the
established Tortue production before offloading to oil tankers.
For further information, please contact:
Knut R. Sæthre, CFO BW Energy
+47 91 11 78 76 or ir@bwenergy.no
About BW Energy:
BW Energy is a growth E&P company with a differentiated strategy targeting
proven offshore oil and gas reservoirs through low risk phased developments. The
Company has access to existing production facilities to reduce time to first oil
and cashflow with lower investments than traditional offshore developments. The
main assets are 73.5% of the producing Dussafu Marine Permit offshore Gabon, a
95% interest in the Maromba field in Brazil and a 95% interest in the Kudu field
in Namibia, all operated by BW Energy. Total net 2P+2C reserves and resources
were 428 million barrels at the start of 2023.
This information is subject to the disclosure requirements pursuant to section
5-12 of the Norwegian Securities Trading Act.
More information:
Access the news on Oslo Bors NewsWeb site
Source
BW Energy Limited
Provider
Oslo Børs Newspoint
Company Name
BW ENERGY LIMITED
ISIN
BMG0702P1086
Symbol
BWE
Market
Oslo Børs